IMHO the house is looking great, and I can't believe how this has been such a relatively stress free build that it has been.
Sunday, 22 September 2013
Day 207 - last day before final walkthru
I have had a final inspection performed by NHI, as usual a very thorough job. I will have a feel for the magnitude of the suggested changes when I catch up with the SS tomorrow morning, for what should be the final walkthru.
Monday, 16 September 2013
Thursday, 5 September 2013
Day 190 - Stairs to family room replaced
Original stairs were fine, but step depth looked small due to the step widths, so we agreed with CG to upgrade them.
Original
Sunday, 25 August 2013
Day 179 - It is getting there
Power is on, water is running, virtually all lights are installed, all plumbing features are in and working bath is in and the tiling is almost complete, just need to finish off the Balcony and few odd spots in the wet areas.
Time to think about the landscaping, there are a few challenges dealing with soil level, concrete and hebel. A few more retaining walls will be required.
Thursday, 15 August 2013
Saturday, 3 August 2013
Day 157 - Fixing completed
Painting should be finished on Monday, sparkies have dug holes in the plaster, made somewhat more difficult by the plasters it would seem
Subscribe to:
Posts (Atom)