Showing posts with label Drainage. Show all posts
Showing posts with label Drainage. Show all posts

Tuesday, 24 September 2013

Day 209 - EOD

Progress on driveway, aggregate to be exposed tomorrow I guess. 
Sideway behind garage starting to take shape with concrete laid, and decking posts in position. 
Care need to be taken with all paths laid next to the Hebel, as the hebel overhangs the slab, care needs to be taken that no concrete goes under the hebel, if it does then it is likely that at some point it will rip the hebel off the house due to the fact that the path is lighter than the house and will move more with the natural expansion and contraction of the underlying clay

Still chasing council to approve my fixing the crossover - that might be enough along with all the kitchen and laundry stuff for a while

Wednesday, 26 June 2013

Day 119 - Ready to tile garage roof

Roof trusses have been built, tiles delivered, scaffold erected - only thing missing is someone to place the tiles on the roof - hopefully tomorrow.

Quad has been nailed to the eaves, and work has commenced on connecting the downpipes to the roof.  Lockup must be close

Friday, 22 March 2013

Day 23 - Drainage has started, power box installed

Digger down the back will expose the sewer connection, agi drains are already in place, basic plumbing and drainage has been completed today. :-)