Showing posts with label posi-struts. Show all posts
Showing posts with label posi-struts. Show all posts

Friday, 12 July 2013

Day 135 - Plaster hung and in the process of being sealed




Our SS reports all items mentioned in the report have been rectified, and that the ones I thought hadn't been done, will be done - it was just a timing issue to do it at the right time. 
While this has all been happening we have had a little R&R in the Australian outback, with plenty of Roos and Emus to keep us all on our toes, and to take us away from the house while the plaster and rectifications were done.

Sunday, 14 April 2013

Day 46 - Framing continues


Framing continues at a great pace,  posi-struts divide the ground and first floor at the front of the house.
Posi-struts

 and standard struts are used in the rear, we would have preferred posi-structs throughout for more flexibility, as we have a flat roof at the rear, but alas I didn't think it through and the option was not raised.
Half of the upstairs balcony built - with standard struts

First floor coming along nicely

This is the view from the stair cavity towards the front of the house, with the linen cupboard on the left and the bathroom on the right and the boys bedrooms on the left and right towards the front.
 and the view from the rear is not too bad