Framing continues at a great pace, posi-struts divide the ground and first floor at the front of the house.
| Posi-struts |
and standard struts are used in the rear, we would have preferred posi-structs throughout for more flexibility, as we have a flat roof at the rear, but alas I didn't think it through and the option was not raised.
| Half of the upstairs balcony built - with standard struts |
First floor coming along nicely
This is the view from the stair cavity towards the front of the house, with the linen cupboard on the left and the bathroom on the right and the boys bedrooms on the left and right towards the front.